High strength Al-AlN metal matrix composites for applications at elevated temperatures


Acronym:ALTWON
Project start:01.01.2022
Project end:31.12.2023
Programme:APVV
Project number:SK-CN-21-0012
Institute position in the project:Project co-lead partner
Project leader at the institute:Peter Krížik